TitleProduct

BS1139 Scaffolding Pipe

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2023-12-26 06:43

  • Browse the number:

    398

Send an inquiries

Company Profile

Hangzhou Xiaoguan Import and Export Trading Co., LTD

By certification [File Integrity]

Contact:seomaster(Mr.)  

Email:

Telephone:

Area:Beijing

Address:Beijing

Website:http://www.xinri-steels.com/ http://seomaster.yabofashion.com/

PRODUCT DETAILS

BS1139 Scaffolding Pipe



Scaffolding structures require sturdy and reliable components to ensure safety, and BS1139 HDG (Hot-Dip Galvanized) scaffolding pipes are an essential part of this construction process. They comply with the British Standards Institution's BS1139 specifications, assuring their durability and versatility in various construction projects. The manufacturing process of these pipes involves a thorough hot-dip galvanization process, rendering a zinc coating on their surface, which significantly enhances their longevity and prevents corrosion. The outcome is a highly effective and durable scaffold structure that can withstand varying weather conditions and rugged construction activities.



When it comes to construction, using BS1139 HDG scaffolding pipes brings with it a wide range of benefits. Firstly, these pipes have a remarkable load-bearing capacity, making them capable of handling even the toughest of jobs. The ease of assembly of these pipes is yet another benefit, as it saves both time and effort during the construction process.
Additionally, BS1139 HDG scaffolding pipes are suitable for use in both indoor and outdoor environments, making them extremely versatile. They can withstand extreme weather conditions without succumbing to rust, further enhancing their structural integrity over extended periods of time. This, in turn, translates into cost-effectiveness as it allows for fewer replacements and maintenance costs.
Overall, the use of BS1139 HDG scaffolding pipes in construction is a wise choice as they deliver quality, durability, and strength, and are designed to withstand the toughest construction projects.



 





 



Product Specification



 





 






























Property of BS1139 Scaffolding Pipe



Outer Diameter:



42mm;48.3mm;48.6mm;60.3mm



Thickness:



1.8-4.0mm



Steel Grade:



Q235,Q345,STK400,STK500,S235JR,S275JR



Standard:



BS1139;BS EN39-2001;JIS G3444-2004



Surface:



There are several different types of finishes available for steel products, including hot dip galvanized, pre-galvanized, black/painted, and threaded. Depending on the specific application, certain finishes may be more suitable than others.
Hot dip galvanized refers to a process where the steel is dipped in a bath of molten zinc, creating a protective coating that helps prevent rust and corrosion. Pre-galvanized is a similar process, but the steel is coated with zinc before it is formed into its final shape.
Black or painted finishes refer to the application of a layer of paint or other coating to the steel, typically for aesthetic purposes. Threaded finishes involve the addition of threads to the steel, allowing it to be easily connected to other components.
Ultimately, the choice of finish will depend on the specific needs of the application, as well as factors like cost and availability. It's important to carefully consider all of the options before making a decision, in order to ensure that the finished product meets your requirements and performs as intended.




 




























































Available Size



Outer Diameter(mm)



Wall Thickness(mm)



Length (m)



48.3-48.6



1.8-2.5



0.3-12



48.3-48.6



2.75



0.3-12



48.3-48.6



3



0.3-12



48.3-48.6



3.2



0.3-12



48.3-48.6



3.6



0.3-12



48.3-48.6



3.8



0.3-12



48.3-48.6



4



0.3-12



42.3



2.0-4.0



0.3-12



60.3



2.0-4.0



0.3-12




 



 



Production



The production of HDG scaffolding pipes is a complex process that involves multiple steps. Each step is carefully executed to ensure the production of high-quality and durable pipes. The following is a brief overview of the production flow of HDG scaffolding pipes.

Firstly, a welded pipe inspection is conducted to ensure that the pipes are in good condition and meet the required specifications. Any defects or irregularities are identified and addressed at this stage. After this, the pickling process is carried out to remove impurities from the surface of the pipes.

Next, the pipes are washed and coated with a solvent to prepare them for the hot galvanizing process. The pipes are then aligned and dried before being subjected to the hot galvanizing process. This involves dipping the pipes into molten zinc to create a protective layer on their surface.

Finally, the pipes are packaged and undergo a final inspection to ensure that they meet the required standards. This includes checking for any defects or irregularities that may have occurred during the production process.

Overall, the production flow of HDG scaffolding pipes is a comprehensive process that involves several steps. Each step is crucial in ensuring the production of high-quality and durable pipes that can withstand the rigors of heavy-duty construction work. By following this production flow, manufacturers can produce scaffolding pipes that are reliable, safe, and effective for use in construction projects.



 





 



Packing and Loading



The galvanized scaffolding pipe is packaged in a way that ensures it remains intact during transportation and storage. The bundle contains 61 pieces that are tightly secured with 8 steel straps. This ensures that the pipes do not shift or move around, preventing any damage during transportation.

The careful packaging of the galvanized scaffolding pipe is a testament to the quality of the product. The manufacturers take pride in their work, which is why they spare no effort in ensuring that the pipes are delivered to the customers in perfect condition.



 



http://www.ts-scaffold.com/